Meetings of the System Architecture Team are held every other Thursday. The upcoming schedule can be found on the project calendar.

Conference Information:

AGL-SAT Biweekly Meeting

Join Zoom Meeting
https://zoom.us/j/443971577?pwd=bjg5dGdpTTlPdmpNWlZSQ0RVTWtwZz09

Meeting ID: 443 971 577
Passcode: 239723

Find your local number: https://zoom.us/u/ameRude4a

January 7, 2024

Attendees: Walt, Scott, Ishii, Itoh, Marius, Yamaguchi, Kusakabe, George

  • OSPO EG
    • 1/7
      • Fourth meeting held.
      • Itoh-san or Endo-san will submit a talk for the AMM
      • OSPO BoF session for the AMM could do the the talk as a BoF or as two sessions. Will decide.
      • Itoh-san Confluence account is locked. Walt will help him get unlocked.
  • IVI PR Updates from Toyota
    • 1/7
      • This is week is Japan morning time slot (Friday at 9 am JST). Will review the App Store POC updates, new backend support, and other topics.
      • Need an IVI PR talk to be submitted to the AMM CFP
  • IC EG Updates
    • 1/7
      • Yamaguchi-san getting his last small fixes into Salmon M2 - all fixes no pass CI and can be merged when Jan-Simon gets back from holiday.
      • Embedded World demo integration is next major topic - Dr. Y getting permission from his company to attend.
      • Ishii-san also working on getting travel approved for Embedded World
      • Yamaguchi-san will give a talk at the AMM.
  • Reference Hardware (and other hardware)
    • 1/07
      • Rockchip included for Salmon
      • Vision 5 board patch was created by Yamaguchi-san. Only Qt 6 IVI is available and it requires a specific install package. Needs to be documented if we included it in the release.
  • SDV EG
    • 1/7
      • No meeting this week. Will meet next week to discuss demo apps for the Unified HMI.

Profiles document can be found here.

  • 5/26
    • Document was started last week in Berlin. No updates since then. Will review next SAT call.
    • 9/5
      • AWS completed some code and is awaiting verification of the distributed architecture for heterogeneous multicore architecture. Need to finish verification and determine where the code should be upstreamed to.
      • Richard and Jerry discussed having Jerry and SDV EG fill in the Hypervisor cell part of the architecture.
    • 9/19
      • AWS code for heterogeneous multicore should ready to be published at the end of their current sprint.
      • Kazuki-san is working on the hypervisor cell topic. We would like to touch base with Paul M about these topics as well.
    • 10/5
      • Kazuki-san added the hypervisor cell topic in Confluence. We will review it at the next SAT.
    • 10/17
  • S4SK BSP
    • 7/23
      • We have the firmware that connects the CAN bus to the Linux code. Jan-Simon and Scott will test it out.
  • 2025 demo plan for Embedded World, ALS and more
    • No CES in January. AMM and Embedded World in late February and mid-March
    • Some ideas that were discussed
      • VirtIO loop back for IC containers
      • Make use of unified HMI. Need to port to AGL compositor to make use of the AGL applications
        • Talk to ICS about app ideas
      • App Store POC - need to get some more schedule details from Joel and determine how to do the store hosting
      • Update the gateway demo to use the S4 instead of reference hardware. Would also show off newest demo control panel. The AWS part might be hard or impossible.
  • AMM scheduled for Feb 26-27. We will have the F2F meeting on Feb 28. CFP is open
    • Honda would like to discuss how to accelerate open source functional safety development with Xen, Zephyr and AOSP during the F2F meeting
    • Walt will add the meeting to the wiki page and send an announcement on the mail list

December 10, 2024

Attendees: Walt, Jan-Simon,Ishii, Itoh, Marius, Yamaguchi, Kusakabe

  • OSPO EG
    • 12/10
      • Third meeting held.
  • IVI PR Updates from Toyota
    • 11/12
      • Japan friendly time meeting to be held this week.
    • 11/26
      • No meeting this week due to US Holiday. Next Japan friendly time is December 10 meeting.
      • Would like to schedule a F2F meeting with Joel in Japan (maybe AMM? or another trip he makes to Japan)
      • Update of meta-flutter to 3.24.4 is expected from Toyota to be included with Salman M2
      • App Store POC making progress
    • 12/10
      • Last meeting was canceled due to travel. This week's meeting is in the Japan friendly time slot.
  • IC EG Updates
    • 10/15
      • Qt6 migration complete waiting for last patches to get merged.
    • 11/12
      • Qt6 migration is complete.
      • Reviewing updates to cgroupv1
    • 11/26
      • Should discuss alternatives to LXC and whether IC EG should use a different solution (see gerrit 30510 for complications related to keeping LXC with cgroupsv2). Should keep upstream first in mind vs. creating a bunch of one-off code we need to maintain. Ideally we would have a solution where someone can use a container (LXC or other) “out of the box” without the need to for the external container manager.
        • LXC support for two-layer isolation
        • Yamaguchi-san created container-manager on github. Question of whether this will remain on github or moved to gerrit and whether Yamaguchi-san will maintain the code long term.
        • SAT would like to see additional documentation so that we do not have a single point of knowledge.
        • Discussed gerrit 30504 particularly the need for image-mount.sh
    • 12/10
      • Yamaguchi-san fixed DRM lease issue and it was merged for Salmon M2
  • Reference Hardware (and other hardware)
    • 11/12
      • Rockchip board being added for Salmon
  • SDV EG
    • 7/9
      • No update
    • 8/20
      • VOS gave an update on their latest work during the call this morning.
    • 10/1
      • Update on next UHMI release , schedule is mid-october
      • VOS uploaded more virtio patches to gerrit for review.
    • 11/12
      • Marius working on SPEC-5280 with Panasonic for adding a gRPC API and SPEC-5235 - for Pipewire gstreamer updates to the remoting plug-in.

Profiles document can be found here.

  • 5/26
    • Document was started last week in Berlin. No updates since then. Will review next SAT call.
    • 9/5
      • AWS completed some code and is awaiting verification of the distributed architecture for heterogeneous multicore architecture. Need to finish verification and determine where the code should be upstreamed to.
      • Richard and Jerry discussed having Jerry and SDV EG fill in the Hypervisor cell part of the architecture.
    • 9/19
      • AWS code for heterogeneous multicore should ready to be published at the end of their current sprint.
      • Kazuki-san is working on the hypervisor cell topic. We would like to touch base with Paul M about these topics as well.
    • 10/5
      • Kazuki-san added the hypervisor cell topic in Confluence. We will review it at the next SAT.
    • 10/17
  • S4SK BSP
    • 7/23
      • We have the firmware that connects the CAN bus to the Linux code. Jan-Simon and Scott will test it out.
  • 2025 demo plan for Embedded World, ALS and more
    • No CES in January. AMM and Embedded World in late February and mid-March
    • Some ideas that were discussed
      • VirtIO loop back for IC containers
      • Make use of unified HMI. Need to port to AGL compositor to make use of the AGL applications
        • Talk to ICS about app ideas
      • App Store POC - need to get some more schedule details from Joel and determine how to do the store hosting
      • Update the gateway demo to use the S4 instead of reference hardware. Would also show off newest demo control panel. The AWS part might be hard or impossible.
  • AMM scheduled for Feb 26-27. We will have the F2F meeting on Feb 28. CFP is open
    • Honda would like to discuss how to accelerate open source functional safety development with Xen, Zephyr and AOSP during the F2F meeting
    • Walt will add the meeting to the wiki page and send an announcement on the mail list