User Tools

Site Tools


eg-ic

This is an old revision of the document!


Instrument Cluster Expert Group

Meeting March 7, 2019

F2F kickoff meeting at AMM Tokyo

Haraki-san presented slides with goals and initial schedule for EG. Target is to have a spec by November. Ideally we will review the spec at the Fall AMM and incorporate into System Spec 2.0.

Which board for initial development?

  • Need a count of board requirements for E3. Renesas will try to get 20 boards

Scott can focus on reducing image size to fit into E3 memory. Would be best to get a memory size target.

Suzuki will provide initial requirements (feature list) in Confluence by April 1.

Feature list for low end IC on a motorcycle could include

  • No additional IVI unit would be included
  • CAN and/or LIN
  • SDL with audio and Bluetooth (including HFP)
  • Small display (need size and resolution)
  • Maximum 2GB RAM
  • Hypervisor or other solution for safety features

What do we do about demo 3 code for IC?

  • Wait and see. Discuss during the May F2F meeting. Should it be merged for now
eg-ic.1551921109.txt.gz · Last modified: 2019/03/07 01:11 by waltminer