- | ==== Meeting 2019/04/17, 2019/08/05 ==== | + | ==== Meeting 2019/10/15 ==== |
+ | |||
+ | == Attendees == | ||
+ | Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Shinji Tsunoda (Subaru), Seiji Goto (Mazda), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) | ||
+ | |||
+ | == Topics == | ||
+ | * RHSA-EG reviewed the RFQ response of the Reference Hardware, and confirmed it almost satisfies the RFQ about Hardware specs, documents, form factor and schedule. | ||
+ | * The response doesn't include BSP. It needs separate discussion how to support BSP in AGL, because it's difficult for Panasonic alone especially about continuous support for production. | ||
+ | * Currently there exists the sample software based on FF, which needs to be known how to provide and use. | ||
+ | * RHSA-EG will feedback by 10/16 (Wed) if any. | ||
+ | |||
+ | ==== Meeting 2019/08/05 ==== | ||
== Attendees == | == Attendees == | ||
Line 7: | Line 18: | ||
== Topics == | == Topics == | ||
- | * RHSA-EG reviewed the {{eg-rhsa:agl_referencehardware_rfq_v0.3.pdf|RFQ}} of the Reference Hardware. | + | * RHSA-EG review the {{eg-rhsa:agl_referencehardware_rfq_v0.3.pdf|RFQ}} of the Reference Hardware. |
* The RFQ has been defined with SAT. The RFQ requires minimum 10 or 20 or more units. The RFQ requires contractor to have design review with RHSA-EG & SAT to determine which trade offs are appropriate for cost vs functionality vs schedule. | * The RFQ has been defined with SAT. The RFQ requires minimum 10 or 20 or more units. The RFQ requires contractor to have design review with RHSA-EG & SAT to determine which trade offs are appropriate for cost vs functionality vs schedule. | ||
* Slides can be found in {{eg-rhsa:rhsa0805.pdf|rhsa0805.pdf}} | * Slides can be found in {{eg-rhsa:rhsa0805.pdf|rhsa0805.pdf}} | ||
+ | |||
+ | ==== Meeting 2019/04/17 ==== | ||
+ | |||
+ | == Attendees == | ||
+ | Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Shinji Tsunoda (Subaru), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) | ||
+ | |||
+ | == Topics == | ||
+ | * RHSA-EG review the Requirement Specification of the Reference Hardware. | ||
+ | * The Requirement Specification defines the goals, use cases, development policy and major feature of the Reference Hardware. The Requirement Specification also defines hardware and software requirement. | ||