User Tools

Site Tools


agl-sat-meetings

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
agl-sat-meetings [2025/02/06 18:17]
wminer
agl-sat-meetings [2025/04/01 13:55] (current)
wminer
Line 15: Line 15:
 Find your local number: https://​zoom.us/​u/​ameRude4a Find your local number: https://​zoom.us/​u/​ameRude4a
  
-==== February 18, 2025 ==== + 
-Attendees: ​ // Upcoming ​meeting//+==== April 1, 2025 ==== 
 +Attendees:  ​Jan-Simon, Scott, Marius, Itoh, Yamaguchi, Ninjouji,  
 + 
 + 
 +   * OSPO EG   
 +     * 4/
 +       * Meeting held earlier today. Executive deck nearly finalized.  
 +       * Brainstormed ideas for next actions.  
 +       * See meeting ​minutes for details.  
 + 
 + 
 +   * IVI PR Updates from Toyota ​  
 +     * 4/1  
 +       * Discussed issue with workspace version mismatch with Flutter version and came up with a way to keep. 
 +       * Joel switching to SDL3 as his wayland wrapper. ​ Need to find out his plans for Trout.  
 +       * Joel is on vacation this week and next.  
 + 
 +   * IC EG Updates ​  
 +     * 4/
 +       * Yamaguchi-san created six Jira tickets to outline improvement to the IC demo for this year. SPEC-5399 is the overall project with the others as subtasks. Plan is compare VirtIO loopback with SocketCAN in the demo. 
    
 +   * Reference Hardware (and other hardware) ​
 +     * 4/1
 +       * Demonstrated the VisionFive2 running flutter at Embedded World and it looked good.
 + 
 +   * SDV EG 
 +     * 4/1 
 +       * Several members had a discussion with AMD about Xen support. Walt got a quote for the Sapphire 5050A board which is very pricey. Need to have a follow up with AMD about possible AGL membership. ​
 +       * Submitted SORA and SOAR as possible names for new SDV platform. ​
 + 
 +
 +   * Waltham replacement SPEC-4689 - would like feedback on the two proposals in the Jira ticket.  ​
 +
 +
 +Profiles document can be found [[https://​docs.google.com/​document/​d/​1c5YcvfHjCzW6PWsuR96q56IYovqc0uMmYvLn7uIwZmA/​edit?​usp=sharing | here]]. ​
 +   * 5/26
 +     * Document was started last week in Berlin. No updates since then. Will review next SAT call. 
 +
 +   * RTOS [[https://​confluence.automotivelinux.org/​pages/​viewpage.action?​pageId=85491736 | Confluence page]]
 +     * 9/5
 +       * AWS completed some code and is awaiting verification of the distributed architecture for [[https://​confluence.automotivelinux.org/​x/​H4AYBQ |heterogeneous multicore architecture]]. Need to finish verification and determine where the code should be upstreamed to. 
 +       * Richard and Jerry discussed having Jerry and SDV EG fill in the [[https://​confluence.automotivelinux.org/​display/​SAT/​Hypervisor+Cell | Hypervisor cell]] part of the architecture. ​
 +     * 9/19
 +       * AWS code for heterogeneous multicore should ready to be published at the end of their current sprint. ​
 +       * Kazuki-san is working on the hypervisor cell topic. We would like to touch base with Paul M about these topics as well. 
 +     * 10/5 
 +       * Kazuki-san added the hypervisor cell topic in Confluence. We will review it at the next SAT. 
 +     * 10/17
 +       * Updated https://​confluence.automotivelinux.org/​display/​SAT/​Hypervisor+Cell .
 +     * 3/18
 + 
 +   * S4SK BSP
 +     * 4/1 - did not show at Embedded World. CAN interface still not working unless it talks to another S4SK board. ​
 + 
 +  ​
 +
 +   * AMM scheduled for July 9-10. We will have the [[https://​wiki.automotivelinux.org/​agl-distro/​jul2025-f2f | F2F meeting on Jul 11]. [[https://​events.linuxfoundation.org/​agl-amm-summer/​program/​cfp/​ | CFP is open]] and closes on May 4
 +
 +New Business
 +   * Discussed proposal from Elektrobit to discuss Debian packaging during the AMM workshop. We will invite them to the workshop. ​
 +
 +
 +==== February 18, 2025 ====
 +Attendees: ​ Jan-Simon, Scott, Marius
 +
 +- skipped -
 +
 +   * Super Salmon 19.0.0 was released. Release notes can be found [[https://​wiki.automotivelinux.org/​agl-distro/​release-notes | here]] ​
 +
    * OSPO EG  ​    * OSPO EG  ​
      * 2/4      * 2/4
Line 25: Line 92:
        * OSPO BoF session - Itoh-san to check if Endo-san can lead the BoF.  ​        * OSPO BoF session - Itoh-san to check if Endo-san can lead the BoF.  ​
        * OSPO EG would like to hire a contractor for technical writing to improve the quality of the documentation. ​        * OSPO EG would like to hire a contractor for technical writing to improve the quality of the documentation. ​
 +     * 2/28
 +       * Added the document to Google drive, Itoh-san will send an email to mail list to announce that the document can be reviewed there. ​
 +       * Walt to set up a meeting to start at noon JST on Tuesday before the SC meeting. Will be in person and on-line.
 +     * 3/18
  
  
Line 31: Line 102:
        * No update this week. Meeting planned for Thursday in the Japan friendly time.         * No update this week. Meeting planned for Thursday in the Japan friendly time. 
        * Joel will make is talk at the AMM remotely.  ​        * Joel will make is talk at the AMM remotely.  ​
 +     * 2/18
 +       * Will cancel the IVI PR call for this week due to Walt's travel. ​
 +     * 3/18
  
    * IC EG Updates  ​    * IC EG Updates  ​
Line 36: Line 110:
        * Testing Salon M4. Found two issues with RPI, one for audio, and one for Rockchip. All will be merged for final Salmon release. ​        * Testing Salon M4. Found two issues with RPI, one for audio, and one for Rockchip. All will be merged for final Salmon release. ​
        * Creating presentation for AMM.         * Creating presentation for AMM. 
 +     * 2/18 
 +       * No update. Dr. Y is traveling this week and next. 
 +     * 3/18
    
    * Reference Hardware (and other hardware) ​    * Reference Hardware (and other hardware) ​
Line 41: Line 118:
        * Rockchip included for Salmon        * Rockchip included for Salmon
        * Vision 5 board patch was created by Yamaguchi-san. Only Qt 6 IVI is available and it requires a specific install package. Needs to be documented if we included it in the release. ​        * Vision 5 board patch was created by Yamaguchi-san. Only Qt 6 IVI is available and it requires a specific install package. Needs to be documented if we included it in the release. ​
 +     * 2/18  
 +       * Will show VisionFive 2 at Embedded World. Jan-Simon is attempting to get Flutter working. Qt 6 will be the fall back. Need to confirm that input is working correctly.  
 +     * 3/18
    
    * SDV EG     * SDV EG 
Line 52: Line 131:
        * Discussed AGL compositor changes with UHMI with Murakami-san and Marius during the call. Documenting in SPEC-5280        * Discussed AGL compositor changes with UHMI with Murakami-san and Marius during the call. Documenting in SPEC-5280
        * Discussed Phase 4 development for VOS.         * Discussed Phase 4 development for VOS. 
 +     * 2/18
 +       * Panasonic internally has developed Unified applications with the Sony Flutter embedder. Some effort may be needed to confirm that it works with the Toyota embedder. ​
 +       * Murakami-san getting married end of next week. Too busy to help us :( 
 +     * 3/18
 + 
  
- +   * Waltham replacement SPEC-4689 - would like feedback on the two proposals in the Jira ticket. ​ 
-   * Waltham replacement SPEC-4689 - would like feedback on the two proposals in the Jira ticket. ​+
  
  
Line 72: Line 155:
      * 10/17      * 10/17
        * Updated https://​confluence.automotivelinux.org/​display/​SAT/​Hypervisor+Cell .        * Updated https://​confluence.automotivelinux.org/​display/​SAT/​Hypervisor+Cell .
 +     * 3/18 
 + 
    * S4SK BSP    * S4SK BSP
      * 7/23      * 7/23
        * We have the firmware that connects the CAN bus to the Linux code. Jan-Simon and Scott will test it out. * 1/21        * We have the firmware that connects the CAN bus to the Linux code. Jan-Simon and Scott will test it out. * 1/21
        * Scott has the unlock firmware flashed and got the CAN interfaces to show up (required windows tool), need to verify CAN bus communication.        * Scott has the unlock firmware flashed and got the CAN interfaces to show up (required windows tool), need to verify CAN bus communication.
- +     * 3/18 
 +  
    * 2025 demo plan for Embedded World, ALS and more    * 2025 demo plan for Embedded World, ALS and more
      * No CES in January. AMM and Embedded World in late February and mid-March      * No CES in January. AMM and Embedded World in late February and mid-March
Line 93: Line 178:
  
 New Business New Business
-     * Presentation by Anylog about [[https://​edgelake.github.io/​ | EdgeLake]]+
  
 ==== February 4, 2025 ==== ==== February 4, 2025 ====
agl-sat-meetings.1738865822.txt.gz · Last modified: 2025/02/06 18:17 by wminer