Table of Contents

Instrument Cluster Expert Group Meeting Info

The Instrument Cluster Expert Groups meets every other Monday The upcoming schedule can be found on the project calendar.

Join Zoom Meeting https://zoom.us/j/692477003

Meeting ID: 692 477 003

Find your local number: https://zoom.us/u/ameRude4a

June 3rd, 2020

Web meeting.

Attendees:Honda, Mazda, BOSCH, Panasonic, Continental, Aisin-AW, NipponSeiki, DENSO, Suzuki

[Draft]Architecture overview AGL+Instrument+Cluster+Physical+architecture

April 28, 2020

Web meeting.

Attendees:Honda, Mazda, BOSCH, Panasonic, Continental, Aisin-AW, NipponSeiki, Suzuki

March 26, 2020

Web meeting.

Attendees:Honda, Mazda, DENSO, BOSCH, Panasonic, Continental, Aisin-AW, NipponSeiki, Marelli, Suzuki

  ic-eg_status200403.pdf

February 18, 2020

Face to face meeting@Suzuki Yokohama

Attendees:Mazda, DENSO, BOSCH, Panasonic, Continental, Aisin-AW, Nippon Seiki, Suzuki

February 11, 2020

Call on zoom:

Attendees: Walt Miner, Jan-Simon, Haraki-san, Scott Murray, Jessie (IVIS), Marius, Dr. Yamaguchi-san, Kusakabe, Mitsunari, Nishiguchi

January 28, 2020

Call on zoom:

Attendees: Walt Miner, Jan-Simon, Haraki-san, Matt Porter, Scott Murray, Jessie (IVIS), Marius, Tanibata-san, Dr. Yamaguchi-san

December 10, 2019

Face to face meeting@Suzuki Yokohama

Attendees:TOYOTA, DENSO, BOSCH, Panasonic, Continental, Aisin-AW, Nippon Seiki, ADIT, Witz, Suzuki

image_eg-ic_3aic_eg_task_list_v1.2_r.pdf

October 9, 2019

Face to face meeting@Web

Attendees:Komatsu,Mukawa,Endo,Taguchi,Yamaguchi,Kusakabe,Nishikata,Mitsunari,Maruyama,Okii,Harald,Axel,Daniel,Haraki

August 27, 2019

Attendees: Jan-Simon, Haraki-san, Kurokawa-san, Scott Murray, Michael, Yamaguchi-san, Pierre, Stephane, Johann, Kusakabe-san

August 5, 2019

Face to face meeting@Yokohama

Attendees:Ohiwa,Komatsu,Hattori,Hamaguchi,Endo,Taguchi,Yamaguchi,Kusakabe,Mitsunari,Maruyama,Haraki

cluster_eg_4th_en_190804.pdf

June 25, 2019

Face to face meeting@Yokohama

Attendees:Ohiwa,Komatsu,Tanibata,Hiuguchi,Endo,Taguchi,Yamaguchi,Kusakabe,Mitsunari,Maruyama,Kamimura,Haraki

cluster_eg_3rd_en_190623.pptx

May 30, 2019

Face to face meeting@Nagoya

Attendees:Ohiwa,Komatsu,Namekawa,Tanibata,Hamaguchi,Endo,Taguchi,Yagi,Yamaguchi,Mitsunari,Tohge,Haraki

May 7, 2019

Held in conjunction with the F2F meeting in Spain.

Haraki-san presented an updated requirements matrix. Also showed a presentation. Need to upload both.

Fast boot - Typical requirement for IC is 1/2 second availability, but we need to define what is available in 500 msec and what we can hold off. Also need to define requirements for what is available in 2 seconds, etc.

cluster_eg_190508.pptx

April 23, 2019

Attendees: Walt, Jan-Simon, Michael, Stephane, Tanibata, Johann, Kurokawa

Received notice from Haraki-san and Ohiwa-san that they wanted to cancel the meeting.

Discussed a little about the proposed processor targets.

April 11, 2019

Attendees: Walt, Haraki, Kusakabe, Michele, Kurokawa, Tanibata, Oki ,Salma, Ohiwa, Johann, Stephane, Jan-Simon,

March 26, 2019

Attendees: Walt, Haraki, Kusakabe, Oki, Tanibata, Scott, Ohiwa, Mitsunari, Stephane,

March 12, 2019

Attendees: Walt, Jan-Simon, Haraki, Yamaguchi, Kurokawa, Scott, Fulup, Stephane, Mitsunari, Ohiwa

Haraki-san made a presentation.

  1. Need to gather requirements from OEMs and Tier One suppliers
  2. Summarize requirements from OEMs and Tier Ones into a functional requirements document for Cluster and HUD
  3. Optimize services per the requirements

Suzuki will provide an initial feature list by April 1. Walt will start the Confluence page.

Need to recruit additional OEM and Tier One members to the EG to get their requirements.

OEM

Tier One

Renesas working on getting E3 boards. Recommend starting with M3 and using software techniques (kernel config) to reduce the allowed cores and memory usage to simulate an E3 environment. IoT.bzh and Renesas will work together to figure out to do this. (SPEC-2254)

What do we do about demo 3 code for IC? Mitsunari and Ohiwa think this is not part of the EG-IC.

March 7, 2019

F2F kickoff meeting at AMM Tokyo

Haraki-san presented slides with goals and initial schedule for EG. Target is to have a spec by November. Ideally we will review the spec at the Fall AMM and incorporate into System Spec 2.0.

Which board for initial development?

Scott can focus on reducing image size to fit into E3 memory. Would be best to get a memory size target.

Suzuki will provide initial requirements (feature list) in Confluence by April 1.

Feature list for low end IC on a motorcycle could include

What do we do about demo 3 code for IC?