The Instrument Cluster Expert Groups meets every other Monday The upcoming schedule can be found on the project calendar.
Join Zoom Meeting https://zoom.us/j/692477003
Meeting ID: 692 477 003
Find your local number: https://zoom.us/u/ameRude4a
Web meeting.
Attendees:Honda, Mazda, BOSCH, Panasonic, Continental, Aisin-AW, NipponSeiki, DENSO, Suzuki
[Draft]Architecture overview AGL+Instrument+Cluster+Physical+architecture
Web meeting.
Attendees:Honda, Mazda, BOSCH, Panasonic, Continental, Aisin-AW, NipponSeiki, Suzuki
Web meeting.
Attendees:Honda, Mazda, DENSO, BOSCH, Panasonic, Continental, Aisin-AW, NipponSeiki, Marelli, Suzuki
Face to face meeting@Suzuki Yokohama
Attendees:Mazda, DENSO, BOSCH, Panasonic, Continental, Aisin-AW, Nippon Seiki, Suzuki
Call on zoom:
Attendees: Walt Miner, Jan-Simon, Haraki-san, Scott Murray, Jessie (IVIS), Marius, Dr. Yamaguchi-san, Kusakabe, Mitsunari, Nishiguchi
Call on zoom:
Attendees: Walt Miner, Jan-Simon, Haraki-san, Matt Porter, Scott Murray, Jessie (IVIS), Marius, Tanibata-san, Dr. Yamaguchi-san
Face to face meeting@Suzuki Yokohama
Attendees:TOYOTA, DENSO, BOSCH, Panasonic, Continental, Aisin-AW, Nippon Seiki, ADIT, Witz, Suzuki
Face to face meeting@Web
Attendees:Komatsu,Mukawa,Endo,Taguchi,Yamaguchi,Kusakabe,Nishikata,Mitsunari,Maruyama,Okii,Harald,Axel,Daniel,Haraki
Attendees: Jan-Simon, Haraki-san, Kurokawa-san, Scott Murray, Michael, Yamaguchi-san, Pierre, Stephane, Johann, Kusakabe-san
Face to face meeting@Yokohama
Attendees:Ohiwa,Komatsu,Hattori,Hamaguchi,Endo,Taguchi,Yamaguchi,Kusakabe,Mitsunari,Maruyama,Haraki
Face to face meeting@Yokohama
Attendees:Ohiwa,Komatsu,Tanibata,Hiuguchi,Endo,Taguchi,Yamaguchi,Kusakabe,Mitsunari,Maruyama,Kamimura,Haraki
Face to face meeting@Nagoya
Attendees:Ohiwa,Komatsu,Namekawa,Tanibata,Hamaguchi,Endo,Taguchi,Yagi,Yamaguchi,Mitsunari,Tohge,Haraki
Held in conjunction with the F2F meeting in Spain.
Haraki-san presented an updated requirements matrix. Also showed a presentation. Need to upload both.
Fast boot - Typical requirement for IC is 1/2 second availability, but we need to define what is available in 500 msec and what we can hold off. Also need to define requirements for what is available in 2 seconds, etc.
Attendees: Walt, Jan-Simon, Michael, Stephane, Tanibata, Johann, Kurokawa
Received notice from Haraki-san and Ohiwa-san that they wanted to cancel the meeting.
Discussed a little about the proposed processor targets.
Attendees: Walt, Haraki, Kusakabe, Michele, Kurokawa, Tanibata, Oki ,Salma, Ohiwa, Johann, Stephane, Jan-Simon,
Attendees: Walt, Haraki, Kusakabe, Oki, Tanibata, Scott, Ohiwa, Mitsunari, Stephane,
Attendees: Walt, Jan-Simon, Haraki, Yamaguchi, Kurokawa, Scott, Fulup, Stephane, Mitsunari, Ohiwa
Haraki-san made a presentation.
Suzuki will provide an initial feature list by April 1. Walt will start the Confluence page.
Need to recruit additional OEM and Tier One members to the EG to get their requirements.
OEM
Tier One
Renesas working on getting E3 boards. Recommend starting with M3 and using software techniques (kernel config) to reduce the allowed cores and memory usage to simulate an E3 environment. IoT.bzh and Renesas will work together to figure out to do this. (SPEC-2254)
What do we do about demo 3 code for IC? Mitsunari and Ohiwa think this is not part of the EG-IC.
F2F kickoff meeting at AMM Tokyo
Haraki-san presented slides with goals and initial schedule for EG. Target is to have a spec by November. Ideally we will review the spec at the Fall AMM and incorporate into System Spec 2.0.
Which board for initial development?
Scott can focus on reducing image size to fit into E3 memory. Would be best to get a memory size target.
Suzuki will provide initial requirements (feature list) in Confluence by April 1.
Feature list for low end IC on a motorcycle could include
What do we do about demo 3 code for IC?