User Tools

Site Tools


project:lifecycle

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
project:lifecycle [2014/10/02 19:38]
wminer
project:lifecycle [2014/10/03 23:35] (current)
wminer
Line 1: Line 1:
-{{:​project:​process_lifecycle.png?​600|}}+**THIS PAGE IS UNDER CONSTRUCTION!!** 
 + 
 + 
 +---- 
 + 
 + 
 +{{ :​project:​process_lifecycle.png?​600 |}}
  
 Complete lifecycle Complete lifecycle
Line 7: Line 13:
  
  
-{{:​project:​project_lifecycle_stage_1-2.png?​600|}}+{{ :​project:​project_lifecycle_stage_1-2.png?​600 |}}
  
 **Entrance Criteria**: **Entrance Criteria**:
Line 23: Line 29:
 **Exit Criteria**: **Exit Criteria**:
   * Wiki page completed and put on Steering Committee backlog for review.   * Wiki page completed and put on Steering Committee backlog for review.
 +
 +----
  
 ==== Proposed ==== ==== Proposed ====
-{{:​project:​project_lifecycle_stage_1-3.png?​600|}}+{{ :​project:​project_lifecycle_stage_1-3.png?​600 |}}
  
  
Line 41: Line 49:
   * Steering Committee approval based on resource plan and schedule as well as System Architecture Team approval.   * Steering Committee approval based on resource plan and schedule as well as System Architecture Team approval.
   * Advisory Board approval if budget or infrastructure increases are requested   * Advisory Board approval if budget or infrastructure increases are requested
 +
 +----
  
 ==== Planning ==== ==== Planning ====
-{{:​project:​project_lifecycle_stage_1-4.png?​600|}}+{{ :​project:​project_lifecycle_stage_1-4.png?​600 |}} 
  
-**Entrance Criteria**: 
-  * Criteria 1  
  
 **Activities**:​ **Activities**:​
-  * Activity 1+  * Project referred to System Architecture Team or Expert Group for any necessary guidance 
 +Project Team responsible for architecture and high level design 
 +Monthly Status Reports to Steering Committee 
  
  
 **Exit Criteria**: **Exit Criteria**:
-  * Criteria 1+  * SAT or outside EG participation identified (if required) 
 +Project schedule and development plan approved  
 +High level architecture and design complete 
 +Code repositories set up and committers identified 
 +Upstream plan create 
 +Build scripts created 
 +Approver: Expert Group, System Architecture Team, Steering Committee 
 +----
 ==== Execution ==== ==== Execution ====
-{{:​project:​project_lifecycle_stage_1-5.png?​600|}} +{{ :​project:​project_lifecycle_stage_1-5.png?​600 |}} 
-**Entrance Criteria**:​ +
-  * Criteria 1 +
  
 **Activities**:​ **Activities**:​
-  * Activity 1+  * Project is actively worked by the community overseen by the Project Team.  
 +Outputs include source code, documentation,​ test cases 
 +Roadmap and schedule actively maintained 
 +Monthly Status Reports and regular demos to Steering Committee 
  
  
 **Exit Criteria**: **Exit Criteria**:
-  * Criteria 1+  * Project goals met or next execution cycle ready to start 
 + 
 +Approver: Project Team, Steering Committee 
 +Criteria 1 
 +----
 ==== Complete ==== ==== Complete ====
-{{:​project:​project_lifecycle_stage_1-1.png?​600|}} +{{ :​project:​project_lifecycle_stage_1-1.png?​600 |}} 
-**Entrance Criteria**:​ +
-  * Criteria 1 +
  
 **Activities**:​ **Activities**:​
-  * Activity 1+  * Code incorporated into mainline and maintainer identified for AGL repositories 
 +Code sent upstream if necessary 
  
  
 **Exit Criteria**: **Exit Criteria**:
-  * Criteria ​1+  * Exit Criteria 
 +Post-mortem conducted and results documented 
 + 
 +Approver: Steering Committee 
project/lifecycle.1412278712.txt.gz · Last modified: 2014/10/02 19:38 by wminer