Line 1: Line 1:
 +//**This Project is now complete. This page is maintained as an archive.** ​
 +//
 +
 ==== Project Name  ==== ==== Project Name  ====
  
Line 4: Line 7:
  
 ==== Repo Name ====  ==== Repo Name ==== 
- +N/A
-Please select a Repository (Repo) name for your project. ​ Please keep in mind it should be: +
-* all lower case +
-* Short +
-* Suitable for use as a java/C identifier like a package name+
  
 ==== Description ​ ==== ==== Description ​ ====
 +
 +
  
 Describe the goals and outcomes of the project. Describe the goals and outcomes of the project.
Line 25: Line 26:
 - Is there anything expressly out of scope for this project?​\\ ​ - Is there anything expressly out of scope for this project?​\\ ​
  
 +There are a number of different gap analysis targets that have been considered. ​
 +
 +  - Gap between AGL spec 0.82 and a "​typical IVI system"​
 +  - Gap between AGL spec 0.82 and GENIVI 6
 +  - Gap between AGL spec 0.82 and JLR Use cases 
 +  - 
 ==== Resources Committed (developers committed to working) ​ ==== ==== Resources Committed (developers committed to working) ​ ====
  
-**Action required:** Two different expert groups have been formed around gap analysis. ​[[eg-gap|Gap Analysis Expert Group]] ​and [[eg-gap_feature_gap_analysis|Tizen IVI Feature Gap Analysis]]. Need to determine if both of these expert groups own this project, if the expert groups should be combined, or if a separate project is called for+The [[eg-gap|Gap Analysis Expert Group]] ​owns this project. ​
  
 Proposed by: Proposed by:
Line 64: Line 71:
  
 08 Sep 2014: Top 10 in initial SC rating. Move to new proposal page.  ​ 08 Sep 2014: Top 10 in initial SC rating. Move to new proposal page.  ​
 +20 June 2015: Project considered complete now that spec 1.0 released