project-tizen-gap-analysis [2014/09/16 23:14] wminer [Resources Committed (developers committed to working)] |
project-tizen-gap-analysis [2015/06/19 21:58] (current) wminer |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | //**This Project is now complete. This page is maintained as an archive.** | ||
+ | // | ||
+ | |||
==== Project Name ==== | ==== Project Name ==== | ||
Line 4: | Line 7: | ||
==== Repo Name ==== | ==== Repo Name ==== | ||
- | + | N/A | |
- | Please select a Repository (Repo) name for your project. Please keep in mind it should be: | + | |
- | * all lower case | + | |
- | * Short | + | |
- | * Suitable for use as a java/C identifier like a package name | + | |
==== Description ==== | ==== Description ==== | ||
+ | |||
+ | |||
Describe the goals and outcomes of the project. | Describe the goals and outcomes of the project. | ||
Line 25: | Line 26: | ||
- Is there anything expressly out of scope for this project?\\ | - Is there anything expressly out of scope for this project?\\ | ||
+ | There are a number of different gap analysis targets that have been considered. | ||
+ | |||
+ | - Gap between AGL spec 0.82 and a "typical IVI system" | ||
+ | - Gap between AGL spec 0.82 and GENIVI 6 | ||
+ | - Gap between AGL spec 0.82 and JLR Use cases | ||
+ | - | ||
==== Resources Committed (developers committed to working) ==== | ==== Resources Committed (developers committed to working) ==== | ||
- | **Action required:** Two different expert groups have been formed around gap analysis. [[eg-gap|Gap Analysis Expert Group]] and [[eg-gap_feature_gap_analysis|Tizen IVI Feature Gap Analysis]]. Need to determine if both of these expert groups own this project, if the expert groups should be combined, or if a separate project is called for. | + | The [[eg-gap|Gap Analysis Expert Group]] owns this project. |
Proposed by: | Proposed by: | ||
Line 64: | Line 71: | ||
08 Sep 2014: Top 10 in initial SC rating. Move to new proposal page. | 08 Sep 2014: Top 10 in initial SC rating. Move to new proposal page. | ||
+ | 20 June 2015: Project considered complete now that spec 1.0 released |