User Tools

Site Tools


eg-rhsa:meetings

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
eg-rhsa:meetings [2018/06/27 05:54]
yukiohta234 [Meeting 2018/06/01, 2018/06/22]
eg-rhsa:meetings [2019/10/16 03:56] (current)
FukutarouSekine [Meeting 2019/10/15]
Line 1: Line 1:
 ===== Meeting Minutes ===== ===== Meeting Minutes =====
  
 +==== Meeting 2019/10/15 ====
 + 
 +== Attendees ==
 +Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Shinji Tsunoda (Subaru), Seiji Goto (Mazda), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) ​
 + 
 +== Topics ==
 +  * RHSA-EG reviewed the RFQ response of the Reference Hardware, and confirmed it almost satisfies the RFQ about Hardware specs, documents, form factor and schedule.
 +  * The response doesn'​t include BSP. It needs separate discussion how to support BSP in AGL, because it's difficult for Panasonic alone especially about continuous support for production.
 +  * Currently there exists the sample software based on FF, which needs to be known how to provide and use.
 +  * RHSA-EG will feedback by 10/16 (Wed) if any.
 +
 +==== Meeting 2019/08/05 ====
 + 
 +== Attendees ==
 +Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) ​
 + 
 +== Topics ==
 +  * RHSA-EG review the {{eg-rhsa:​agl_referencehardware_rfq_v0.3.pdf|RFQ}} of the Reference Hardware.
 +  * The RFQ has been defined with SAT. The RFQ requires minimum 10 or 20 or more units. The RFQ requires contractor to have design review with RHSA-EG & SAT to determine which trade offs are appropriate for cost vs functionality vs schedule.
 +  * Slides can be found in {{eg-rhsa:​rhsa0805.pdf|rhsa0805.pdf}}
 +
 +==== Meeting 2019/04/17 ====
 + 
 +== Attendees ==
 +Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), ​ Shinji Tsunoda (Subaru), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) ​
 + 
 +== Topics ==
 +  * RHSA-EG review the Requirement Specification of the Reference Hardware.
 +  * The Requirement Specification defines the goals, use cases, development policy and major feature of the Reference Hardware. The Requirement Specification also defines hardware and software requirement.
 +
 +==== Meeting 2018/11/09, 2019/02/25 ====
 + 
 +== Attendees ==
 +Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Shinji Tsunoda (Subaru), Seiji Goto (Mazda), Akio Nakadachi (Mazda), Osamu Yamaji (Mazda) ​
 + 
 +== Topics ==
 +[Reference Hardware 2nd Step] 
 +  * RHSA-EG set the goal and scope of the 2nd step Reference Hardware by clarifying the use cases, and discussed at AGL Advisory Board Meeting and F2F Technical Meeting in AMM Tokyo.
 +  * Slides can be found in {{eg-rhsa:​rhsa_eg_20190225.pdf|rhsa_eg_20190225.pdf}}
 ==== Meeting 2018/06/01, 2018/06/22 ==== ==== Meeting 2018/06/01, 2018/06/22 ====
  
 == Topics == == Topics ==
 [Reference Hardware 1st Step] [Reference Hardware 1st Step]
-  * RHSA-EG had a meeting with Intel, Okaya  and AAEON Electronics ​about the 1st step of Reference Hardware.+  * RHSA-EG had a meeting with Intel, Okaya Electronics ​and AAEON about the 1st step of Reference Hardware.
     * It is necessary to clarify the schedule whether the demo system will be available in the beginning of 2019.     * It is necessary to clarify the schedule whether the demo system will be available in the beginning of 2019.
     * The next meeting will be held on July 2 or 3.     * The next meeting will be held on July 2 or 3.
eg-rhsa/meetings.1530078883.txt.gz ยท Last modified: 2018/06/27 05:54 by yukiohta234