This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
eg-rhsa:meetings [2018/06/27 05:44] yukiohta234 |
eg-rhsa:meetings [2019/10/16 03:50] FukutarouSekine [Meeting 2019/08/05] |
||
---|---|---|---|
Line 1: | Line 1: | ||
===== Meeting Minutes ===== | ===== Meeting Minutes ===== | ||
+ | ==== Meeting 2019/10/15 ==== | ||
+ | |||
+ | == Attendees == | ||
+ | Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Shinji Tsunoda (Subaru), Seiji Goto (Mazda), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) | ||
+ | |||
+ | == Topics == | ||
+ | * RHSA-EG reviewed the RFQ response of the Reference Hardware, and confirmed it almost satisfies the RFQ about Hardware specs, documents, form factor and schedules. | ||
+ | * It needs separate discussion how to support BSP in AGL, because it's difficult for Panasonic alone especially about continuous support for production. | ||
+ | * Currently there exists the sample software based on FF, which needs to be known how to provide and use. | ||
+ | * RHSA-EG will feedback by 10/17 (Wed) if any. | ||
+ | |||
+ | ==== Meeting 2019/08/05 ==== | ||
+ | |||
+ | == Attendees == | ||
+ | Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) | ||
+ | |||
+ | == Topics == | ||
+ | * RHSA-EG review the {{eg-rhsa:agl_referencehardware_rfq_v0.3.pdf|RFQ}} of the Reference Hardware. | ||
+ | * The RFQ has been defined with SAT. The RFQ requires minimum 10 or 20 or more units. The RFQ requires contractor to have design review with RHSA-EG & SAT to determine which trade offs are appropriate for cost vs functionality vs schedule. | ||
+ | * Slides can be found in {{eg-rhsa:rhsa0805.pdf|rhsa0805.pdf}} | ||
+ | |||
+ | ==== Meeting 2019/04/17 ==== | ||
+ | |||
+ | == Attendees == | ||
+ | Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Shinji Tsunoda (Subaru), Akio Nakadachi (Mazda), Fukutaro Sekine (Mazda) | ||
+ | |||
+ | == Topics == | ||
+ | * RHSA-EG review the Requirement Specification of the Reference Hardware. | ||
+ | * The Requirement Specification defines the goals, use cases, development policy and major feature of the Reference Hardware. The Requirement Specification also defines hardware and software requirement. | ||
+ | |||
+ | ==== Meeting 2018/11/09, 2019/02/25 ==== | ||
+ | |||
+ | == Attendees == | ||
+ | Toshikazu Ohiwa (Toyota), Toshihisa Haraki (Suzuki), Yasuyuki Komatsu (Honda), Shinji Tsunoda (Subaru), Seiji Goto (Mazda), Akio Nakadachi (Mazda), Osamu Yamaji (Mazda) | ||
+ | |||
+ | == Topics == | ||
+ | [Reference Hardware 2nd Step] | ||
+ | * RHSA-EG set the goal and scope of the 2nd step Reference Hardware by clarifying the use cases, and discussed at AGL Advisory Board Meeting and F2F Technical Meeting in AMM Tokyo. | ||
+ | * Slides can be found in {{eg-rhsa:rhsa_eg_20190225.pdf|rhsa_eg_20190225.pdf}} | ||
==== Meeting 2018/06/01, 2018/06/22 ==== | ==== Meeting 2018/06/01, 2018/06/22 ==== | ||
== Topics == | == Topics == | ||
[Reference Hardware 1st Step] | [Reference Hardware 1st Step] | ||
- | * RHSA-EG had a meeting with Intel, Okaya and AAEON Electronics about the 1st step of Reference Hardware. | + | * RHSA-EG had a meeting with Intel, Okaya Electronics and AAEON about the 1st step of Reference Hardware. |
* It is necessary to clarify the schedule whether the demo system will be available in the beginning of 2019. | * It is necessary to clarify the schedule whether the demo system will be available in the beginning of 2019. | ||
- | * he next meeting will be held on July 2 or 3. | + | * The next meeting will be held on July 2 or 3. |