This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
eg-connectivity:meetings [2022/08/25 13:28] wminer |
eg-connectivity:meetings [2023/03/22 13:10] (current) wminer Updated to point to App FW EG meeting minutes |
||
---|---|---|---|
Line 12: | Line 12: | ||
------- | ------- | ||
+ | |||
+ | NOTE: Starting March 12, 2023 the Connectivity EG meetings have been held during the App FW EG Meeting. Please refer to the [[eg-app-fw:meetings|meeting minutes]] for details. | ||
+ | |||
+ | ==== February 9, 2023 ==== | ||
+ | Attendees: Walt, Scott, Jan-Simon, | ||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 1/26 | ||
+ | * Kuksa.val running in the CES demo and is up to date in the Needlefish and Octopus releases. | ||
+ | |||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * New: | ||
+ | * Off-topic - discussed Yocto CVE checker and whether the members are interested in using it. Would need to back port to kirkstone and dunfell once the upstream work is completed. | ||
+ | |||
+ | * Discussed the AVL / TU Graz use case. Scott will document the CES build instructions on the doc site. Suggested using the Flutter Cluster demo because it has a larger number of signals that are changing. Update 2/9 - Scott got Markus unblocked. Still needs to update documentation. | ||
+ | |||
+ | |||
+ | ==== January 26, 2023 ==== | ||
+ | Attendees: Walt, Scott, Jan-Simon, Markus Wolf (AVL), Andrea Pferscher (TU Graz) | ||
+ | |||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 1/26 | ||
+ | * Kuksa.val running in the CES demo and is up to date in the Needlefish and Octopus releases. | ||
+ | |||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * New: | ||
+ | * Radio tuner API added back using gRPC and is included in Needlefish and Octopus. | ||
+ | * Discussed the AVL / TU Graz use case. Scott will document the CES build instructions on the doc site. Suggested using the Flutter Cluster demo because it has a larger number of signals that are changing. | ||
+ | * | ||
+ | |||
+ | ==== January 12, 2023 ==== | ||
+ | Attendees: Walt, Scott | ||
+ | |||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 6/1 | ||
+ | * Scott has kuksa.val and the VIS connected up to the steering wheel for LIN on the green machine. | ||
+ | * 7/28 | ||
+ | * Kuksa.val improved gRPC is starting to show up in their repo along with the refactoring of their repo that Scott previously discussed with Sebastian. Will decide if it goes into a Needlefish release point release or directly into Octopus. | ||
+ | * 8/11 | ||
+ | * Kuksa.val gRPC work looks like it is complete upstream. Scott looking for an official release and will try to join their call next week. | ||
+ | * 8/25 | ||
+ | * Kuksa.val gRPC work landed. Latest version needs to be updated in our builds. gRPC conversion on our side will be later in the year. | ||
+ | * 9/8 | ||
+ | * Getting ready for training class on September 29 and ELCE | ||
+ | * 9/21 | ||
+ | * Uploaded fixes for kuksa_viss_client (cert issue w/ python, cmd2 utility fix) - master and needlefish | ||
+ | * Likely update kuksa to get grpc | ||
+ | * 10/6 | ||
+ | * Scott looking at bumping kuksa.val to the latest tag or head of master. | ||
+ | * 11/3 | ||
+ | * Kuksa.val was bumped to latest tag on AGL/master and Needlefish | ||
+ | * 12/15 | ||
+ | * Kuksa.val running in the CES demo. | ||
+ | |||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | |||
+ | New: | ||
+ | |||
+ | |||
+ | ==== December 15, 2022 ==== | ||
+ | Attendees: Walt, Jan-Simon, Scott | ||
+ | |||
+ | * ACAIS V2C Demo - Chih-Ming | ||
+ | * 6/1 | ||
+ | * No update | ||
+ | * 9/22 | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 6/1 | ||
+ | * Scott has kuksa.val and the VIS connected up to the steering wheel for LIN on the green machine. | ||
+ | * 7/28 | ||
+ | * Kuksa.val improved gRPC is starting to show up in their repo along with the refactoring of their repo that Scott previously discussed with Sebastian. Will decide if it goes into a Needlefish release point release or directly into Octopus. | ||
+ | * 8/11 | ||
+ | * Kuksa.val gRPC work looks like it is complete upstream. Scott looking for an official release and will try to join their call next week. | ||
+ | * 8/25 | ||
+ | * Kuksa.val gRPC work landed. Latest version needs to be updated in our builds. gRPC conversion on our side will be later in the year. | ||
+ | * 9/8 | ||
+ | * Getting ready for training class on September 29 and ELCE | ||
+ | * 9/21 | ||
+ | * Uploaded fixes for kuksa_viss_client (cert issue w/ python, cmd2 utility fix) - master and needlefish | ||
+ | * Likely update kuksa to get grpc | ||
+ | * 10/6 | ||
+ | * Scott looking at bumping kuksa.val to the latest tag or head of master. | ||
+ | * 11/3 | ||
+ | * Kuksa.val was bumped to latest tag on AGL/master and Needlefish | ||
+ | * 12/15 | ||
+ | * Kuksa.val running in the CES demo. | ||
+ | |||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | |||
+ | New: | ||
+ | |||
+ | |||
+ | ==== November 3, 2022 ==== | ||
+ | Attendees: Walt, Jan-Simon, Scott | ||
+ | |||
+ | * ACAIS V2C Demo - Chih-Ming | ||
+ | * 6/1 | ||
+ | * No update | ||
+ | * 9/22 | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 6/1 | ||
+ | * Scott has kuksa.val and the VIS connected up to the steering wheel for LIN on the green machine. | ||
+ | * 7/28 | ||
+ | * Kuksa.val improved gRPC is starting to show up in their repo along with the refactoring of their repo that Scott previously discussed with Sebastian. Will decide if it goes into a Needlefish release point release or directly into Octopus. | ||
+ | * 8/11 | ||
+ | * Kuksa.val gRPC work looks like it is complete upstream. Scott looking for an official release and will try to join their call next week. | ||
+ | * 8/25 | ||
+ | * Kuksa.val gRPC work landed. Latest version needs to be updated in our builds. gRPC conversion on our side will be later in the year. | ||
+ | * 9/8 | ||
+ | * Getting ready for training class on September 29 and ELCE | ||
+ | * 9/21 | ||
+ | * Uploaded fixes for kuksa_viss_client (cert issue w/ python, cmd2 utility fix) - master and needlefish | ||
+ | * Likely update kuksa to get grpc | ||
+ | * 10/6 | ||
+ | * Scott looking at bumping kuksa.val to the latest tag or head of master. | ||
+ | * 11/3 | ||
+ | * Kuksa.val was bumped to latest tag on AGL/master and Needlefish | ||
+ | |||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | |||
+ | New: | ||
+ | |||
+ | |||
+ | |||
+ | ==== October 6, 2022 ==== | ||
+ | Attendees: Walt, Paul, Scott | ||
+ | |||
+ | * ACAIS V2C Demo - Chih-Ming | ||
+ | * 6/1 | ||
+ | * No update | ||
+ | * 9/22 | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 6/1 | ||
+ | * Scott has kuksa.val and the VIS connected up to the steering wheel for LIN on the green machine. | ||
+ | * 7/28 | ||
+ | * Kuksa.val improved gRPC is starting to show up in their repo along with the refactoring of their repo that Scott previously discussed with Sebastian. Will decide if it goes into a Needlefish release point release or directly into Octopus. | ||
+ | * 8/11 | ||
+ | * Kuksa.val gRPC work looks like it is complete upstream. Scott looking for an official release and will try to join their call next week. | ||
+ | * 8/25 | ||
+ | * Kuksa.val gRPC work landed. Latest version needs to be updated in our builds. gRPC conversion on our side will be later in the year. | ||
+ | * 9/8 | ||
+ | * Getting ready for training class on September 29 and ELCE | ||
+ | * 9/21 | ||
+ | * Uploaded fixes for kuksa_viss_client (cert issue w/ python, cmd2 utility fix) - master and needlefish | ||
+ | * Likely update kuksa to get grpc | ||
+ | * 10/6 | ||
+ | * Scott looking at bumping kuksa.val to the latest tag or head of master. | ||
+ | |||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | |||
+ | New: | ||
+ | |||
+ | |||
+ | ==== September 22, 2022 ==== | ||
+ | Attendees: Jan-Simon, Scott, Ayush Kumar, | ||
+ | |||
+ | * ACAIS V2C Demo - Chih-Ming | ||
+ | * 6/1 | ||
+ | * No update | ||
+ | * 9/22 | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 6/1 | ||
+ | * Scott has kuksa.val and the VIS connected up to the steering wheel for LIN on the green machine. | ||
+ | * 7/28 | ||
+ | * Kuksa.val improved gRPC is starting to show up in their repo along with the refactoring of their repo that Scott previously discussed with Sebastian. Will decide if it goes into a Needlefish release point release or directly into Octopus. | ||
+ | * 8/11 | ||
+ | * Kuksa.val gRPC work looks like it is complete upstream. Scott looking for an official release and will try to join their call next week. | ||
+ | * 8/25 | ||
+ | * Kuksa.val gRPC work landed. Latest version needs to be updated in our builds. gRPC conversion on our side will be later in the year. | ||
+ | * 9/8 | ||
+ | * Getting ready for training class on September 29 and ELCE | ||
+ | * 9/21 | ||
+ | * Uploaded fixes for kuksa_viss_client (cert issue w/ python, cmd2 utility fix) - master and needlefish | ||
+ | * Likely update kuksa to get grpc | ||
+ | |||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | |||
+ | New: | ||
+ | |||
+ | |||
+ | ==== September 8, 2022 ==== | ||
+ | Attendees: Walt, Scott, Shubkam, Shruti | ||
+ | |||
+ | * ACAIS V2C Demo - Chih-Ming | ||
+ | * 6/1 | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * CAN/ Vehicle Signaling | ||
+ | * 6/1 | ||
+ | * Scott has kuksa.val and the VIS connected up to the steering wheel for LIN on the green machine. | ||
+ | * 7/28 | ||
+ | * Kuksa.val improved gRPC is starting to show up in their repo along with the refactoring of their repo that Scott previously discussed with Sebastian. Will decide if it goes into a Needlefish release point release or directly into Octopus. | ||
+ | * 8/11 | ||
+ | * Kuksa.val gRPC work looks like it is complete upstream. Scott looking for an official release and will try to join their call next week. | ||
+ | * 8/25 | ||
+ | * Kuksa.val gRPC work landed. Latest version needs to be updated in our builds. gRPC conversion on our side will be later in the year. | ||
+ | * 9/8 | ||
+ | * Getting ready for training class on September 29 and ELCE | ||
+ | * | ||
+ | |||
+ | * Bluetooth | ||
+ | * No update | ||
+ | |||
+ | |||
+ | * Ref HW | ||
+ | * No update | ||
+ | |||
+ | |||
+ | |||
+ | * 5G/LTE module and Telephony | ||
+ | * No update | ||
+ | |||
+ | New: | ||
+ | |||
+ | |||
==== August 25 2022 ==== | ==== August 25 2022 ==== | ||
Attendees: Walt, Scott, Jan-Simon | Attendees: Walt, Scott, Jan-Simon |