User Tools

Site Tools


agl-sat-meetings

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
agl-sat-meetings [2022/04/28 13:50]
waltminer
agl-sat-meetings [2022/05/12 13:32]
waltminer
Line 17: Line 17:
  
 ----- -----
 +
 +==== May 12, 2022 ====
 +Attendees: Walt, Jan-Simon, Scott, Ishii, Marius, Date, Jerry, Bernard, Yamaguchi, ​
 +
 +
 +   * IVI PR Updates from Toyota
 +     * 3/3
 +       * Discussed Toyota plan for multiple app support for Flutter. Should get a better idea of timing from Toyota at the next IVI PR meeting. ​
 +     * 3/17
 +       * Toyota has run multiple apps using XDG shell, They are running multiple embedder instances rather than multiple apps within a single embedder. Question is does it need to use AGL shell and compositor and what changes to them might be required to support this use case?  Toyota will try using the AGL compositor and get back to us with any issues that might need to be fixed. ​
 +     * 3/31 
 +       * No updates other than plan is to be ready for end of July
 +     * 4/14
 +       * No updates
 +     * 4/28
 +       * SPEC-4326 is being used to discuss updates to support multi-applications using Flutter. We will try to update the IVI PR EG meeting time to morning in Japan and afternoon PDT so we can include Joel and Chris in the ongoing discussions. ​
 +     * 5/12
 +       * No updates. Still arranging the new IVI EG meeting time. Patch to fix base system (building evklib) with latest kernel version was proposed by Scott and merged yesterday. Date-san said that this will be deprecated once the base system updates are pushed by Toyota later in the year, 
 +
 +
 +   * IC EG Updates ​
 +
 +     * 3/17
 +       * Initial iGel commits have been merged for DRM lease update. Initial review of final code planned for dev call next week. Final review at workshop in April. ​
 +       * Documentation for Marlin is in progress and will be ready for the first patch release.  ​
 +       * Final version of IC EG priorities on [[https://​confluence.automotivelinux.org/​x/​iABXAg | Confluence]]. Merged to spreadsheet by Dr. Y is complete.
 +     * 3/31
 +       * DRM lease review started in gerrit. ​
 +     * 4/14
 +       * Damian has posted some patches for DRM Lease that need to be reviewed in gerrit.  ​
 +     * 4/28 
 +       * Damian'​s patches for DRM lease are ready to be merged into both Marlin and master.  ​
 +     * 5/12
 +       * DRM Lease merged into master and Marlin. Will discuss CES and EW plans next week during F2F. 
 +
 +   * Reference Hardware
 +
 +   * 3/17
 +     * No update
 +   * 4/14
 +     * Notes from SC
 +     * Question during AGL Tech Day which Qualcomm hardware will be supported. ​
 +       * Walt setting up call with QC to discuss BSP availability of QC BSPs in general
 +         * Hypervisor and VirtIO support availability ​
 +         * Bare metal Linux support
 +         * BSP layer available for Koi in Code Aurora, but it is not clear that can be built without the full Qualcomm tree which is not publicly available (only a subset is available on Code Aurora)
 +         * Audio support. Does Qualcomm support PipeWire and WirePlumber? ​  Our understanding is that the audio is dependent on Pulse Audio and it is not clear how to make AGL's audio work. 
 +         * Would like to see a lower cost development board available (under $1000)
 +         * BSP maintenance. How often will the BSP be updated?
 +         * What does the graphics stack look like?
 +       * Panasonic was looking at SA8155P or SA6155P for reference hardware. ​
 +       * Lantronix https://​estore.lantronix.com/​products/​sa8155p-automotive-development-platform?​_ga=2.246129284.1823353144.1649893661-111201632.1649893661
 +       * Amazon interested in Quectel AG55XQ https://​www.quectel.com/​product/​5g-c-v2x-ag55xq-automotive-module
 +     * 4/28
 +       * Panasonic let us know that they have built sample boards with the SA8155P and are currently in discussion with Qualcomm about BSP distribution. They hope to have an agreement with QC by the end of June. There is then a 5 month lead time to build the new boards for the reference hardware once that agreement is reached. ​
 +       * Walt to set up a call with QC now that we have all of the information from Panasonic to see what we can do push this forward. ​
 +     * 5/12 
 +       * No update
 +
 +
 +   * Virt EG
 +     * 4/14
 +       * Jerry discussed the touch panel availability with Date-san and confirmed the choice of panels. See [[https://​confluence.automotivelinux.org/​x/​kwDuAg | Confluence]] for more details. ​
 +     * 4/28
 +       * Will schedule 3 hours for VirtIO and Container discussion on Wednesday morning during the Berlin workshop. ​
 +     * 5/12
 +       * Virt EG call canceled this week, but Jerry had an off-line meeting with Virtual Open Systems and Open Synergy. They will be ready with presentations next week in Berlin.
 +
 +
 +New Business:
 +   * Walt and Jan-Simon will create a new Github repo for the new spec that was discussed during the Workshop last week FIXME to include link. At the next SAT call we will have a template for each of the images and profiles to be reviewed by the SAT. Will use the IVI demo image as the test case for the template. ​
 +
 +
  
 ==== April 28, 2022 ==== ==== April 28, 2022 ====
agl-sat-meetings.txt ยท Last modified: 2024/03/19 13:36 by wminer