User Tools

Site Tools


agl-sat-meetings

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
agl-sat-meetings [2019/06/06 12:56]
waltminer Agenda for June 6 meeting
agl-sat-meetings [2019/06/06 15:00]
waltminer
Line 22: Line 22:
  
 ==== June 6, 2019 ==== ==== June 6, 2019 ====
-Attendees: ​//Upcoming Meeting//+Attendees: ​Walt, Jan-Simon, Scott, Tanikawa, George, Kusakabe, Marc, David Fries (SanCloud), Michael, Daniel, Guy, Sebastien, Yamaguchi
  
    * Weston 6.0 discussion    * Weston 6.0 discussion
-     ​* ​All targets except ​i.MX6 now build.  +     * i.Mx6 unstable startup, but probably not a Weston issue. Scott working on updating the changes.  
-     * No major problems identified ​yetM3, Vayu, and RPI still need to be verified.+     * No major problems identified ​on other boardsDaniel looking at problem with QEMU not starting
  
    * Update from Daniel on Window Manager architecture    * Update from Daniel on Window Manager architecture
-     ​* ​+     ​* ​Scott (NZ) working on getting the existing demo home screen working. ​
  
    * Update from George on PipeWire    * Update from George on PipeWire
-     * See Jan-Simon'​s {{:​audio_system_recipes_in_hh.pdf|presentation on build and configuration}}. ​+     * See Jan-Simon'​s {{:​audio_system_recipes_in_hh-2.pdf|presentation on build and configuration}}. ​ 
 +     * Decision by SAT as documented in the presentation:​ Pipewire only solution for HH.  
 +         * PipeWire is a new switch in aglsetup. Remove the 4a switch. Leave Sound Manager switch intact.  
 +         * +  Easier code implementation. Can remove #ifdefs in apps and services that require knowledge of which audio implementation is in use 
 +         * +  Audio will work but policy plugin available in Icefish  
 +         * +  Apps are already ported and need less code (if old code removed) 
 +         * - unicens/​agl-service-unicens needs to be ported (target 8.0.1) 
 +         * - Knife switch. HH will not support 4a. Sound Manager sources will be included, but will not be built or tested by AGL.  
 +         * - Bluetooth audio will not be functional in 8.0.0. Target patch release 8.0.1 for Bluetooth audio 
  
    * Doc site update    * Doc site update
-     * New doc site is now live with the multi-branch switcher.  ​ 
-     * XDS documentation being updated by Scott R.. Link checker was run and found about 25 broken links within the page that need to be fixed. Scott working on that as well.  
      * Common method for documenting the APIs is needed so that developers know what is expected of them for documentation and we have a method for displaying the APIs on the doc website. Walt will send an email to address this.       * Common method for documenting the APIs is needed so that developers know what is expected of them for documentation and we have a method for displaying the APIs on the doc website. Walt will send an email to address this. 
      * Need some help with CSS and layout. There are known issues that need to be addressed. ​      * Need some help with CSS and layout. There are known issues that need to be addressed. ​
Line 55: Line 62:
      * warrior 2.7 is now released. Can revive agl-next branch to start tracking warrior. ​      * warrior 2.7 is now released. Can revive agl-next branch to start tracking warrior. ​
      * 5/23 - Need Jira ticket for bump to 2.6.2. Assign to Tom.       * 5/23 - Need Jira ticket for bump to 2.6.2. Assign to Tom. 
 +     * 6/6 - Done. Master now on 2.6.2. ​
  
      * Site for Sep F2F Meeting (week 37 (Sep 9) interferes with Linux Plumbers)      * Site for Sep F2F Meeting (week 37 (Sep 9) interferes with Linux Plumbers)
Line 62: Line 70:
      * Ask Scott to post to wiki page or doc site instructions for building CES 2019 demo units. ​      * Ask Scott to post to wiki page or doc site instructions for building CES 2019 demo units. ​
      * Jan-Simon asking for comments on gerrit 21389, restructure of the folder layout in gerrit. ​      * Jan-Simon asking for comments on gerrit 21389, restructure of the folder layout in gerrit. ​
 +       * 6/6 - Now targeted for RC2
  
    * New Business    * New Business
 +     * Schedule a follow-up SAT call for Tuesday morning in CIAT slot. 
  
 ==== May 23, 2019 ==== ==== May 23, 2019 ====
agl-sat-meetings.txt · Last modified: 2024/04/30 13:31 by wminer