agl-sat-meetings [2019/04/25 12:45]
waltminer
agl-sat-meetings [2019/04/25 13:53]
waltminer
Line 28: Line 28:
  
 ==== April 25, 2019 ==== ==== April 25, 2019 ====
-Attendees: ​//Upcoming Meeting//+Attendees: ​Walt, Jan-Simon, Tom, Alexey, Scott, Eugeniy, Lorenzo, Stephane, George, Kusakabe, Nakadachi, Yamaguchi, Sebastien, Michael F, Michael T, Eric, Hosokawa
  
  
Line 43: Line 43:
  
    * Update from George on PipeWire    * Update from George on PipeWire
-     * Working on Pipewire session manager for policy management. Julian also working on the project to get Bluetooth running. ​Plan is to have a working session manager ​and Bluetooth stack for the F2F meeting in May. Will also work with Wim on outstanding PipeWire design issues for automotive. ​+     * Working on Pipewire session manager for policy management. Julian also working on the project to get Bluetooth running ​(A2DP now working. HFP in progress)George ​is working ​on session manager for the F2F meeting in May. Will also work with Wim on outstanding PipeWire design issues for automotive. ​
  
    * Doc site update    * Doc site update
      * New doc site is now live with the multi-branch switcher.  ​      * New doc site is now live with the multi-branch switcher.  ​
      * Need some help with CSS and layout. There are known issues that need to be addressed. ​      * Need some help with CSS and layout. There are known issues that need to be addressed. ​
-     * Mobile support not working (404 errors)Need to have layout very wide to see the branch switching, etc. +     * Mobile support not working (404 errors)- Fixed  
 +     ​* ​Need to have layout very wide to see the branch switching, etc. 
  
    * RHSA Update    * RHSA Update
-     * Nakadachi-san {{::​rhsa_update_20190411.pdf|provided this update}}. Requirements spec 0.2 is available on the RHSA page. Revised plan is for SAT to review the spec, then the hardware design will be kicked off with Panasonic. Plan is for 10 units to be available by the end of September. ​+     * Nakadachi-san {{::​rhsa_update_20190411.pdf|provided this update}}. Requirements spec 0.2 is available on the RHSA page. Revised plan is for SAT to review the spec at the F2F meeting. Plan is for 10 units to be available by the end of September. ​
  
    * Navi EG    * Navi EG
-     * new navigation app - https://​gerrit.automotivelinux.org/​gerrit/#/​c/​21032/​+     * new navigation app (Mapbox based) ​- https://​gerrit.automotivelinux.org/​gerrit/#/​c/​21032/​ 
 +     * Remove old navigation app from recipe 
 +     * POI should work out of the box with the new Navi app
  
  
-   * Yocto - Anything ​to report?+   * Yocto - thud 2.6.2 was just released with our fixes. Need to bump for master.  
 +     * warrior 2.7 is now at M3 
  
    * New Business    * New Business
 +     * None
  
  