* RHSA Update | * RHSA Update | ||
- | * Nakadachi-san updated us. Requirements spec 0.2 is available on the RHSA page. Revised plan is for SAT to review the spec, then the hardware design will be kicked off with Panasonic. Plan is for 10 units to be available by the end of September. | + | * Nakadachi-san {{::rhsa_update_20190411.pdf|provided this update}}. Requirements spec 0.2 is available on the RHSA page. Revised plan is for SAT to review the spec, then the hardware design will be kicked off with Panasonic. Plan is for 10 units to be available by the end of September. |
* Navi EG | * Navi EG |