User Tools

Site Tools


agl-distro:jul2020-f2f

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
agl-distro:jul2020-f2f [2020/07/16 05:33]
nakadachi
agl-distro:jul2020-f2f [2020/10/07 10:07] (current)
LiXiaoming [Attendees]
Line 35: Line 35:
   - Fulup Ar Foll - IoT.bzh   - Fulup Ar Foll - IoT.bzh
   - Stéphane Desneux - IoT.bzh   - Stéphane Desneux - IoT.bzh
 +  - Vincent Rubiolo - IoT.bzh
   - Kenji Hosokawa - ADIT   - Kenji Hosokawa - ADIT
   - Riku Nomoto - Toyota   - Riku Nomoto - Toyota
Line 44: Line 45:
   - Fukutaro Sekine - Mazda   - Fukutaro Sekine - Mazda
   - Akio Nakadachi - Mazda(AM only)   - Akio Nakadachi - Mazda(AM only)
 +  - Jyunya Monden - ADIT 
 +  - Yuki Tsunashima - ADIT
 ==== Agenda ===== ==== Agenda =====
  
Line 52: Line 54:
  
  
-09:00 - 09:15 Introductions and Agenda Review ​+08:00 - 08:15 Introductions and Agenda Review ​
  
-9:15 - 10:00 - Review the Sound System RFQ. +08:15 - 09:00 - Review the Sound System RFQ (SPEC-3471).  
 +   * Nishiguchi-san will summarize the results of the discussion in the JIRA ticket. 
 +   * George stated that the requirements are well suited for an implementation of WirePlumber in the Container Host, but it is heavily dependent on the container run-time that is chosen. Therefore he Container Host's runtime environment should be selected prior to starting the work on this sound manager.  
 +   * Container run-time is assumed to be LXC by the IC EG.   
 +   * Fulup stated that support for smart hardware amplifiers with advanced hardware capabilities such as MP3 decoding or mixing needs to be accounted for in the Container Host design
  
-10:00 - 10:15 - Panasonic Display Sharing Proposal+09:00 - 09:15 - Panasonic Display Sharing Proposal
  
-10:15 - 11:45 Toyota Proposal for IVI Product Readiness+09:15 - 10:15 Window Manager and Compositor Roadmap ​
  
-11:45 - 12:15 Break, Free Discussion+10:15 - 11:45 - Toyota Proposal for IVI Product Readiness (SPEC-3501) 
 +   * Special SAT Calls for Product readiness every 2 weeks starting Aug 6 at 3 pm JST. 
  
-12:15 - 13:45 - Instrument Cluster Topics+   * March 21 Product Ready Trial 
 +     * +Test App for IVI PR means both current demo apps and Toyota PR Test apps both run 
 +     * +RBA means Window Manager/ Audio Manager with RBA added on (to be discussed if this can be achieved in the schedule)  
 +   * December 2021 
 +     * +BT, Radio is new development being done for BT and Tuner by Konsulko based on Toyota gap analysis 
 +     * +HMI is TBD what that means 
 +     * +HMI Service is a new compositor or builds on existing Compositor+RBA that is completed in March?
  
-13:45 14:15 Denso Rules Based Arbitration+   * Reviewed proposal from Jan-Simon for reworking the Yocto layers and build system. ​   
 +     * Core part of the layer design will be discussed in SAT meeting 
 +     * OEM layer design will be discussed in Special SAT meeting. Tanikawa-san has thinking about this as  his homework for August 6 meeting.
  
-14:15 - 15:00 Window Manager and Compositor Roadmap ​+11:45 12:15 - Break, Free Discussion
  
-15:00 16:00 - CIAT Topics+12:15 - 12:45 Denso Rules Based Arbitration 
 +   * Nishiguchi-san made a presentation on the Denso RBA implementation.  
 +   * Presentation slides is {{:​agl-distro:​rulebasedarbitrator_a02.pdf|RuleBasedArbitrator_A02.pdf}}. 
 + 
 +12:45 - 14:15 - Instrument Cluster Topics 
 +   * Share to document update since previous discussion. 
 +   * Share to jirra example from Jan-Simon.  
 +   * Static analysis tool. 
 +     * propriety tool vs Jan-Simon recommenced tool. 
 +   * Instrument Cluster Architecture design review 
 +     * ICEG require to special SAT meeting, need to set a date. 
 + 
 +14:15 - 15:00 - CIAT Topics
  
 ==== Topics ==== ==== Topics ====
Line 87: Line 114:
    * Rule Based Arbitration presented by Denso (ADIT)    * Rule Based Arbitration presented by Denso (ADIT)
      * Upstream to AGL in progress. Need to translate the Japanese comments in the code and header files. Should be ready to upstream in August. ​      * Upstream to AGL in progress. Need to translate the Japanese comments in the code and header files. Should be ready to upstream in August. ​
 +
 +
 +==== Documents/​Slides ====
 +
 +  * {{:​agl-distro:​notes_on_production_ready_ivi_proposal.pdf|Notes/​Comments on Production Ready IVI proposal}}
 +  * {{:​agl-distro:​rulebasedarbitrator_a02.pdf|RuleBasedArbitrator_A02.pdf}}
agl-distro/jul2020-f2f.1594877598.txt.gz · Last modified: 2020/07/16 05:33 by nakadachi