User Tools

Site Tools


agl-distro:jul2020-f2f

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
agl-distro:jul2020-f2f [2020/07/17 06:07]
wminer
agl-distro:jul2020-f2f [2020/10/07 10:05]
LiXiaoming [Attendees]
Line 35: Line 35:
   - Fulup Ar Foll - IoT.bzh   - Fulup Ar Foll - IoT.bzh
   - Stéphane Desneux - IoT.bzh   - Stéphane Desneux - IoT.bzh
 +  - Vincent Rubiolo - IoT.bzh
   - Kenji Hosokawa - ADIT   - Kenji Hosokawa - ADIT
   - Riku Nomoto - Toyota   - Riku Nomoto - Toyota
Line 44: Line 45:
   - Fukutaro Sekine - Mazda   - Fukutaro Sekine - Mazda
   - Akio Nakadachi - Mazda(AM only)   - Akio Nakadachi - Mazda(AM only)
 +  - Jyunya Monden - ADIT 
 +  - Yuki Tsunashima - ADIT 
 +  - Li Xiaoming - Fujitsu
 ==== Agenda ===== ==== Agenda =====
  
Line 54: Line 57:
 08:00 - 08:15 Introductions and Agenda Review ​ 08:00 - 08:15 Introductions and Agenda Review ​
  
-08:15 - 09:00 - Review the Sound System RFQ.  +08:15 - 09:00 - Review the Sound System RFQ (SPEC-3471).  
-   ​* ​SPEC-3471+   ​* ​Nishiguchi-san will summarize the results of the discussion in the JIRA ticket. 
 +   * George stated that the requirements are well suited for an implementation of WirePlumber in the Container Host, but it is heavily dependent on the container run-time that is chosen. Therefore he Container Host's runtime environment should be selected prior to starting the work on this sound manager.  
 +   * Container run-time is assumed to be LXC by the IC EG.   
 +   * Fulup stated that support for smart hardware amplifiers with advanced hardware capabilities such as MP3 decoding or mixing needs to be accounted for in the Container Host design. ​
  
 09:00 - 09:15 - Panasonic Display Sharing Proposal 09:00 - 09:15 - Panasonic Display Sharing Proposal
Line 61: Line 67:
 09:15 - 10:15 - Window Manager and Compositor Roadmap ​ 09:15 - 10:15 - Window Manager and Compositor Roadmap ​
  
-10:15 - 11:45 - Toyota Proposal for IVI Product Readiness+10:15 - 11:45 - Toyota Proposal for IVI Product Readiness ​(SPEC-3501) 
 +   * Special SAT Calls for Product readiness every 2 weeks starting Aug 6 at 3 pm JST.  
 + 
 +   * March 21 Product Ready Trial 
 +     * +Test App for IVI PR means both current demo apps and Toyota PR Test apps both run 
 +     * +RBA means Window Manager/ Audio Manager with RBA added on (to be discussed if this can be achieved in the schedule)  
 +   * December 2021 
 +     * +BT, Radio is new development being done for BT and Tuner by Konsulko based on Toyota gap analysis 
 +     * +HMI is TBD what that means 
 +     * +HMI Service is a new compositor or builds on existing Compositor+RBA that is completed in March? 
 + 
 +   * Reviewed proposal from Jan-Simon for reworking the Yocto layers and build system. ​   
 +     * Core part of the layer design will be discussed in SAT meeting 
 +     * OEM layer design will be discussed in Special SAT meeting. Tanikawa-san has thinking about this as  his homework for August 6 meeting.
  
 11:45 - 12:15 - Break, Free Discussion 11:45 - 12:15 - Break, Free Discussion
  
-12:15 - 13:45 - Instrument Cluster Topics+12:15 - 12:45 - Denso Rules Based Arbitration 
 +   * Nishiguchi-san made a presentation on the Denso RBA implementation.  
 +   * Presentation slides is {{:​agl-distro:​rulebasedarbitrator_a02.pdf|RuleBasedArbitrator_A02.pdf}}.
  
-13:45 - 14:15 - Denso Rules Based Arbitration+12:45 - 14:15 - Instrument Cluster Topics 
 +   * Share to document update since previous discussion. 
 +   * Share to jirra example from Jan-Simon.  
 +   * Static analysis tool. 
 +     * propriety tool vs Jan-Simon recommenced tool. 
 +   * Instrument Cluster Architecture design review 
 +     * ICEG require to special SAT meeting, need to set a date.
  
 14:15 - 15:00 - CIAT Topics 14:15 - 15:00 - CIAT Topics
Line 88: Line 115:
    * Rule Based Arbitration presented by Denso (ADIT)    * Rule Based Arbitration presented by Denso (ADIT)
      * Upstream to AGL in progress. Need to translate the Japanese comments in the code and header files. Should be ready to upstream in August. ​      * Upstream to AGL in progress. Need to translate the Japanese comments in the code and header files. Should be ready to upstream in August. ​
 +
 +
 +==== Documents/​Slides ====
 +
 +  * {{:​agl-distro:​notes_on_production_ready_ivi_proposal.pdf|Notes/​Comments on Production Ready IVI proposal}}
 +  * {{:​agl-distro:​rulebasedarbitrator_a02.pdf|RuleBasedArbitrator_A02.pdf}}
agl-distro/jul2020-f2f.txt · Last modified: 2020/10/07 10:07 by LiXiaoming