This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
agl-distro:jul2020-f2f [2020/07/16 01:37] oki.shigeyuki [Attendees] |
agl-distro:jul2020-f2f [2020/10/07 10:05] LiXiaoming [Attendees] |
||
---|---|---|---|
Line 35: | Line 35: | ||
- Fulup Ar Foll - IoT.bzh | - Fulup Ar Foll - IoT.bzh | ||
- Stéphane Desneux - IoT.bzh | - Stéphane Desneux - IoT.bzh | ||
+ | - Vincent Rubiolo - IoT.bzh | ||
- Kenji Hosokawa - ADIT | - Kenji Hosokawa - ADIT | ||
- Riku Nomoto - Toyota | - Riku Nomoto - Toyota | ||
Line 42: | Line 43: | ||
- Li Xiaoming - Fujitsu | - Li Xiaoming - Fujitsu | ||
- Shigeyuki Oki - Mazda | - Shigeyuki Oki - Mazda | ||
- | - Fukutaro Sekine -Mazda | + | - Fukutaro Sekine - Mazda |
+ | - Akio Nakadachi - Mazda(AM only) | ||
+ | - Jyunya Monden - ADIT | ||
+ | - Yuki Tsunashima - ADIT | ||
+ | - Li Xiaoming - Fujitsu | ||
==== Agenda ===== | ==== Agenda ===== | ||
Line 50: | Line 55: | ||
- | 09:00 - 09:15 Introductions and Agenda Review | + | 08:00 - 08:15 Introductions and Agenda Review |
- | 9:15 - 10:00 - Review the Sound System RFQ. | + | 08:15 - 09:00 - Review the Sound System RFQ (SPEC-3471). |
+ | * Nishiguchi-san will summarize the results of the discussion in the JIRA ticket. | ||
+ | * George stated that the requirements are well suited for an implementation of WirePlumber in the Container Host, but it is heavily dependent on the container run-time that is chosen. Therefore he Container Host's runtime environment should be selected prior to starting the work on this sound manager. | ||
+ | * Container run-time is assumed to be LXC by the IC EG. | ||
+ | * Fulup stated that support for smart hardware amplifiers with advanced hardware capabilities such as MP3 decoding or mixing needs to be accounted for in the Container Host design. | ||
- | 10:00 - 10:15 - Panasonic Display Sharing Proposal | + | 09:00 - 09:15 - Panasonic Display Sharing Proposal |
- | 10:15 - 11:45 - Toyota Proposal for IVI Product Readiness | + | 09:15 - 10:15 - Window Manager and Compositor Roadmap |
- | 11:45 - 12:15 - Break, Free Discussion | + | 10:15 - 11:45 - Toyota Proposal for IVI Product Readiness (SPEC-3501) |
+ | * Special SAT Calls for Product readiness every 2 weeks starting Aug 6 at 3 pm JST. | ||
- | 12:15 - 13:45 - Instrument Cluster Topics | + | * March 21 Product Ready Trial |
+ | * +Test App for IVI PR means both current demo apps and Toyota PR Test apps both run | ||
+ | * +RBA means Window Manager/ Audio Manager with RBA added on (to be discussed if this can be achieved in the schedule) | ||
+ | * December 2021 | ||
+ | * +BT, Radio is new development being done for BT and Tuner by Konsulko based on Toyota gap analysis | ||
+ | * +HMI is TBD what that means | ||
+ | * +HMI Service is a new compositor or builds on existing Compositor+RBA that is completed in March? | ||
- | 13:45 - 14:15 - Denso Rules Based Arbitration | + | * Reviewed proposal from Jan-Simon for reworking the Yocto layers and build system. |
+ | * Core part of the layer design will be discussed in SAT meeting | ||
+ | * OEM layer design will be discussed in Special SAT meeting. Tanikawa-san has thinking about this as his homework for August 6 meeting. | ||
- | 14:15 - 15:00 - Window Manager and Compositor Roadmap | + | 11:45 - 12:15 - Break, Free Discussion |
- | 15:00 - 16:00 - CIAT Topics | + | 12:15 - 12:45 - Denso Rules Based Arbitration |
+ | * Nishiguchi-san made a presentation on the Denso RBA implementation. | ||
+ | * Presentation slides is {{:agl-distro:rulebasedarbitrator_a02.pdf|RuleBasedArbitrator_A02.pdf}}. | ||
+ | |||
+ | 12:45 - 14:15 - Instrument Cluster Topics | ||
+ | * Share to document update since previous discussion. | ||
+ | * Share to jirra example from Jan-Simon. | ||
+ | * Static analysis tool. | ||
+ | * propriety tool vs Jan-Simon recommenced tool. | ||
+ | * Instrument Cluster Architecture design review | ||
+ | * ICEG require to special SAT meeting, need to set a date. | ||
+ | |||
+ | 14:15 - 15:00 - CIAT Topics | ||
==== Topics ==== | ==== Topics ==== | ||
Line 85: | Line 115: | ||
* Rule Based Arbitration presented by Denso (ADIT) | * Rule Based Arbitration presented by Denso (ADIT) | ||
* Upstream to AGL in progress. Need to translate the Japanese comments in the code and header files. Should be ready to upstream in August. | * Upstream to AGL in progress. Need to translate the Japanese comments in the code and header files. Should be ready to upstream in August. | ||
+ | |||
+ | |||
+ | ==== Documents/Slides ==== | ||
+ | |||
+ | * {{:agl-distro:notes_on_production_ready_ivi_proposal.pdf|Notes/Comments on Production Ready IVI proposal}} | ||
+ | * {{:agl-distro:rulebasedarbitrator_a02.pdf|RuleBasedArbitrator_A02.pdf}} |